Autumn 2026

As the 24V wiring was underway it was decided to fit the batteries in the carriage. The spot
chosen was the SW corner of the cargo area as this is enclosed in what the GA drawing calls a "parcel locker". The
shore supply charger, mini consumer unit and PA receiver were also mounted in this area.
The remaining set of 4 x 6V batteries from sleeper 10580 were conditioned as per 16122's and recoverd well very
quickly. These were then installed in Mk1 TSOd 4529 which forms part of the branch set. The original leisure batteries
from 4529 were put up for resuscitation as their capacity was very low.

New steel piping and fittings were purchased to plumb the vacuum brake system and also to do the steam heating. One length of 2" pipe was sufficient to bridge the gap in the solebar vacuum pipe which had been left after removal of the tool racks. Brian Williams kindly threaded this and some bits of 1 1/2" pipe for Brian Robertson to plumb in. The 1 1/2" pipe is for the steam heating and finding a route for this piping to clear the revised brake rigging was quite difficult.

A condensate drain valve will be fitted at the lowest point in the steam heating piping so that condensed steam can drain out to prevent splitting due to freezing.

John and Graham continued the job of strengthening the end "walls" of the compartment seats. These will be covered by padded moquette cards but the backing has to be strong to support the armrests.

Graeme contiued the apparently endless task of making the new and refurbed exterior doors in to "ex-works" condition. Jim Grady worked, again apparently endlessly, on servicing the door locks for these doors.